CLIENT: SOCIÈTÈ DES MINES SYAMA SA

SYAMA GOLD MINE, MALI

Routine inspection work on a replacement smokestack that the company successfully helped to erect in 2013.

 

CLIENT: PT PAITON ENERGY

PAITON POWER STATION, INDONESIA

Inspection of a 210 m high smoke stack and various boiler pressure components in the 700 MW Unit 7 boiler

 

CLIENT: ESKOM

MATIMBA POWER STATION, LEPHALALE, LIMPOPO

Eskom Smoke stack - protective coating application

 

CLIENT: BLUE BULLS RUGBY UNION

LOFTUS VERSFELD RUGBY STADIUM, PRETORIA

The roof cladding repair as part of routine maintenance.

 

CLIENT: ESKOM

TUTUKA POWER STATION, MPUMALANGA

Industrial vacuum cleaning work on hard-to-reach structures that are inaccessible to
standard methods such as scaffolding as part of Eskom’s continued maintenance strategy.

 

CLIENT: MOTOROLA

ILLOVO, JOHANNESBURG

Installation of rope access systems for window cleaning applications.

 

CLIENT: ORLANDO TOWERS VERTICAL ADVENTURE CENTRE

ORLANDO TOWERS SOWETO

Installation of the swing and platform at the Orlando Towers Vertical Adventure Centre.

 

CLIENT: MITSUBISHI HITACHI POWER SYSTEMS AFRICA (PTY) LTD AND MURRAY & ROBERTS POWER & ENERGY

MEDUPI POWER STATION, LIMPOPO

Bolting, torque verification, rigging, painting, NDT and height safety

 

CLIENT: ESKOM

COAL FIRED POWER STATION

Protective coating application

 

CLIENT: LARGE PETROCHEMICAL PRODUCER

PETROCHEMICAL PLANT, FREE STATE

Maintenance of deluge fire sprinkler system installed on petrochemical, fuel and gas tanks

icon inspections

icon installation

protective coatings

icon confinedSpaces

icon maintenance

African Cleaning Review, 1 July 2015

Following prolonged exposure to regular lightning strikes that caused structural damage to the top of a 106 m-high smoke stack at a copper mine in Phalaborwa, leading rope access specialist Skyriders was contracted to complete the repair work.

 Download Full Document in PDF Format

Skyriders Clients

Skyriders News

In the Press

Submit your CV